Back to full facility management training list
Automated Logic to provide the building automation system for 3 World Trade Center (WTC) - Resource for Facility Managers
The third tallest building in the WTC master plan, 3 WTC is located on Greenwich Street opposite the WTC Memorial. The 80-story, 2.8 million square foot tower includes 53 floors of office space, five trading floors and five levels of retail space at and below grade. The building, being developed by Silverstein Properties, is designed to the highest energy efficiency ratings and is working toward the U.S. Green Building Council's Leadership in Energy and Environmental Design® (LEED) Gold certification upon project completion scheduled for 2015.
Automated Logic will deliver a seamless building automation solution that provides control and monitoring of heating, cooling and fire alarm systems as well as a direct interface with an innovative 1.2 MW PureCell fuel cell system designed by UTC Power, which will generate clean, efficient power onsite for 3 WTC.
source: http://www.sacbee.com
http://www.sacbee.com/2012/01/31/4227455/automated-logic-awarded-9-million.html#storylink=cpy