« Back to Facilities Management News Home

« HVAC

Expanded Boiler Line and Improved Ease of Use


Cleaver-Brooks has designed and engineered a complete line of pre-engineered, skid-mounted hydronic boiler solutions so the system is pre-piped and ready for start-up. Upon arrival, only the final connection has to be made, significantly reducing installation time.

“If a facility engages a mechanical contractor to assemble the skid, they have to wait for the boiler components to arrive before installation can get underway,” said Sean Lobdell, director of sales for Packaged Boiler at Cleaver-Brooks. “Our system is pre-piped and pre-wired, so a facility can be operational weeks faster.”

Cleaver-Brooks offers hydronic skid solutions for its full line of hot water boilers, including its new ClearFire-CE, which was named a finalist in the 2018 AHR Show Innovation Awards. Every Cleaver-Brooks pre-engineered skid system includes the boiler, system pumps, air separator and expansion tank. Optional items include a chemical pot feeder and glycol fill station.

Pre-engineered hydronic skids are available for gas-fired, condensing boiler systems ranging in size from 500 to 12,000 MBH capacity. Custom hot water boiler skids are available in a wide range of capacities to meet other system needs. Up to six boilers can be combined in a pre-engineered system, and additional boilers can be added as a custom-engineered solution.

Cleaver-Brooks also offers skid systems for its broad range of electric, firetube and flexible watertube boilers.





Contact FacilitiesNet Editorial Staff »   posted on: 8/30/2018


More From 8/30/2018 on FacilitiesNet