Testing New Processes, Strategies Before Occupation Helps Ease Transition





By Naomi Stanford  
OTHER PARTS OF THIS ARTICLEPt. 1: How Effective Change Management, Transparency Can Help With Major ChangesPt. 2: This PagePt. 3: Massive Renovation Turns Old Office Space Into New Healthcare Facility


During its year-long transition to a new space, Chase Brexton Health Care focused on testing new processes and strategies before occupation to work out any challenges.

As the year progressed, future scenarios, care processes, and waste elimination strategies were tried and modified at other locations and even in the new space before it was occupied to test assumptions and feasibility. Numerous changes, some as large as centralizing services (i.e., the various providers come to the patient rather than the reverse) to as simple as instituting a new check list, were trialed and implemented.

Live Simulation Exercise

The acid test was a live simulation of the new facility with 50 "patients" — volunteers supplied courtesy of a multinational employer with a facility in Baltimore. Each volunteer was given a role to play.

One team of Chase Brexton staff tested their newly designed roles in the newly out-fitted space using the newly designed processes. Volunteer patients went through the whole patient reception, treatment, and completion of visit as if they were real patients — except they didn't get actual treatment. Observers recorded what was going on, where the issues were, and how the staff managed in the new space. The list of issues was daunting but none was irremediable before opening day, scheduled for about a month later.

The staff has now moved in. Evaluation highlighted some notable features of this project:

  • The organization managed the significant challenges it faced, not through a standardized or traditional change management process, but through a pragmatic and tailored transition that evolved through the business process redesign activities they engaged in.
  • The change was not only associated with the Monumental Life Building but with the whole organizational system — the move to a new location was simply a vehicle for wider organizational change.
  • Close links were maintained between the transition teams, senior leadership, and the architects and interior designers. The interior space and the patient flow were developed in sync. An earlier rapid prototyping exercise mocked up the new flow before there had been any commitment to a specific interior layout.
  • The senior leadership team recognized that, in changing situations, communication is not enough. People doing the work on the frontline have to be closely involved in designing the change, and this is an iterative process.

Naomi Stanford, PhD, consults on aspects of organization design and culture change with various clients in commercial, government, and non-profit sectors in, the United States and Europe. She is the author of several books on organizational design and corporate culture, including Organizational Health. Previously, she was organizational design director for NBBJ, where she worked on the Chase Brexton change management program. She can be reached at naomi@stanford.cc.




Contact FacilitiesNet Editorial Staff »