Flooring Installation Modernizes Veterans Clinic

                                                                                                                                                      To be awarded a VA project, especially one of this size and complexity, Master Craft had to demonstrate over the previous 5-6 years what it means to have an International Standards and Training Alliance (INSTALL) contractor perform installations.



The Department of Veterans Affairs and Master Craft Flooring have worked together on multiple projects over the course of several years. When Master Craft was awarded the bid through a local contractor joint venture to handle a sizable flooring installation in the Veterans Rehabilitation Clinic in Ann Arbor, Mich., it was not the first time they crossed paths on a job site. 

The project spanned two floors and 31,000 square feet. With a plan for intricate patterns, colors and a broad scope of materials, the VA designers, in conjunction with interior designers from the Albert Kahn architectural firm, sought to create the feeling of walking into a hotel space as opposed to a clinical facility. This meant evolving every floor from its ’80s-era look and feel to a modern, yet timeless design using materials that were durable, safe for patient care and would not date the facility.

To be awarded a VA project, especially one of this size and complexity, Master Craft had to demonstrate over the previous 5-6 years what it means to have an International Standards and Training Alliance (INSTALL) contractor perform installations. INSTALL operates the highest level of training and certification in the North American floorcovering industry. The quality of its programming is such that the Department of Veteran Affairs recently implemented INSTALL certification standards into its Section 09 68 00 Carpeting, Section 09 65 19 Resilient Tile Flooring, and Section 09 68 21 Athletic Carpeting Master Specifications. This specification language underscores the Department of Veteran Affairs’ determination that only a flooring contractor who employs an INSTALL certified workforce is qualified enough to perform work for the VA, the single largest government employer in the United States.

Aside from the complexities of completing a flooring installation in a healthcare environment, the design of the space called for a laundry list of flooring material to boot. Specified products included 1,300 square yards of Interface carpet tile, 11 different Armstrong resilient sheet vinyl products, five colors of flash cove and caps, 12,600 feet of vinyl plank and vinyl tile spanning three colors, 4,100 feet of rubber tile, 3,000 linear feet of millwork resilient base, and 3,000 feet of standard vinyl base.

In healthcare settings, especially government ones, design teams tend to be more limited in what they have for material options due to infection control, maintenance and keeping up with the highest level of code standards due to these constraints the walls must be practical. Thus flooring becomes the natural surface for creative output and is often used to break up long corridors. In this case, designs called for incredibly intricate patterns such as leaves and flowers that could only be accomplished with highly skilled professional flooring labor. The patterning was also specifically designed to be used for wayfinding and navigation.

Patient needs play a large role in driving the direction of the design as well. With the majority of patients in an older age group and the need for a calm atmosphere of healing, patterns had to be subtle to the eye. Logistical challenges were presented since this was a renovation of a working hospital requiring off-hour work and closing certain areas during constructions.

In a design this intricate, it can be difficult to assign balance and maintain the integrity of the design.

“All parties were able to be flexible, understand each other and meet in the middle which made for a good collaboration,” said Meaghan Short, interior designer at the VA Ann Arbor Healthcare System. “Master Craft was honest in workability and flexible to our needs. They even supported us in a last minute material change. We had originally specified a recycled rubber gym floor material, which is hard to clean, especially when patients are shuffling their feet. Master Craft was instrumental in making the decision to change to a virgin rubber floor and being able to keep the exact same patterns with the new material.”

Master Craft’s expertise and ability to produce results was largely due to its level of training and certification through INSTALL as well as the business opportunity afforded by being an INSTALL Warranty Contractor. As one of the most endorsed training programs in the United States, INSTALL provided Master Craft installers the knowledge and experience to handle this level of intricacy as well as working knowledge of every type of material specified. As a result, the VA was extremely satisfied with the completion of the project.