« Facilities Technology Briefs Home /
Roofing
Roof Installation Option - Duro-Last Roofing Inc. - Facility Management Product Release
Duro-Last Roofing Inc.
website
| Company information
The Duro-Bond system uses non-penetrating induction welding technology. It mechanically attaches the company’s PVC membrane to a specially-coated fastening plate beneath the roof membrane; the same plate also fastens insulation and recovery board materials to the roof deck. An induction welding tool generates an electromagnetic field that heats the plate through the membrane, welding the plate’s special coating and bottom PVC membrane film layer together.
RELATED CONTENT
Content Category: Roofing
FEATURES:
QUICK READS:
posted: 5/16/2011