Join our discussion with Facility Influencer John Rimer on Sept. 13
The Las Vegas show takes place Oct. 29-30. Members receive complimentary Elite Level access
Schneider Electric
website
| Company information
Square D® Powerlink® G3 can be an important part of a demand-response strategy by dimming or turning off pre-selected lighting loads when necessary. It is seamless to retrofit into an existing building and integrate within a building-automation system (BAS), and it can quickly react to potential load-shed situations. Panel boards contain a schedule-based controller technicians can configure to include a load-shed lighting sequence that activates based on a command from the BAS.
FEATURES:
QUICK READS:
posted: 5/4/2010